Post Construction and Sediment Controls

“The best way to mitigate stormwater impacts from new developments is to use practices to treat, store, and infiltrate runoff onsite before it can affect water bodies downstream. Innovative site designs that reduce imperviousness and smaller-scale low impact development practices dispersed throughout a site are excellent ways to achieve the goals of reducing flows and improving water quality.  Phase II MS4s are required to address post-construction stormwater runoff from new development and redevelopments that disturb one or more acres.” 

Environmental Protection Agency

SECA offers a number of post-construction controls options.

HYDRODYNAMIC SEPARATORS
FLOGARD DUAL VORTEX HYDRODYNAMIC SEPARATORS by KriSTar

MEDIA FILTRATION
PERK FILTERS by KriStar

DRAIN INLET FILTRATION
FLOGARD products by KriStar

SEDIMENT CONTROL
SLOPEGARD 2
FLOGARD DEWATERING BAG

POST CONSTRUCTION: LOW IMPACT DEVELOPMENT (“LID”)
NETTECH GROSS POLLUTANT TRAPS by KriStar
TREEPOD BIOFILTER by KriStar
SWALEGARD by KriStar

For More Information, for Site Specific questions, or to ORDER NOW, Please CALL (817) 715-8078.

Erosion Control Blankets

Net Tech

Swalegard